Penstock pipes at storage area
Welcome to Daram khola hydro energy
Daram Khola Hydroelectric Project is a run-of-river project located in Galkot-11 of Baglung district and utilizes the water from Daram Khola, the project has an installed capacity of 9.6 MW. The project comprises diversion weir with Undersluice, intake arrangements followed by settling basin, headrace pressure pipe, surge-tank followed by penstock pipe and powerhouse, tailrace canal and switchyards. The generated power will be connected to 33 kV Harichaur Sub-station. The company has to construct 14 km long 33 kV transmission lines from powerhouse to the Harichaur substation in Baglung district.
Read More
Latest News
Read More
दरम खोला हाइड्रोले आईपीओ निष्काशन गर्ने, बिक्री प्रबन्धकमा लक्ष्मी क्यापिटल नियुक्त
2079-03-12
रिघा मनेवा दरमखोला जलविद्युत सहकारी संस्था लि. का शेयर सदस्यहरुले दरमखोला हाइड्रो इनर्जी लिमिटेडको शेयर कायम गर्न कागजात सहित सम्र्पक गर्न आउने वारेको जारी गरिएका
2079-04-25
Downloads
Download More
Message From Chairman
Read More
Our hydro energy project is nearing completion. We have put in tireless efforts to ensure that the project meets the highest standards of excellence, and we are confident that it will serve as a shining example of sustainable energy production in Nepal.We would like to extend our gratitude to all of our supporters, partners, and investors who have made this project possible. We are very much excited to contribute to a cleaner and more sustainable future in Nepal...
Developed By 977Tech